PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Aligning the stone panels at the 3rd floor Facing North.jpg Continued laying out block at Bathrooms 133-136 Facing South.jpg Copper piping at the 3rd floor Facing South-West.jpg Installed cmu block at the 1st floor detention cells Facing North-West.jpg Installing copper piping at the 2nd floor bathroom sinks Facing West.jpg Paching Inside Elevator 1,2,3 shear walls Facing West.jpg
Previous pageNext page Continued laying out block at Bathrooms 133-136 Facing South
Continued laying out block at Bathrooms 133-136 Facing South